Projects

Replacement of corroded insulators on 500 kV Egkh “Imeret”.

In connection with the switching of the double-chain 330 kV “1,2 Gardabani” on the Georgia-Azerbaijan border

Moving the 500 kV Egkh “Imereti” N295 mast from the landslide-prone zone

Conditions hindering the operation of power transmission lines

Replacement of damaged wires on the 500 kV EGH “Imeret” overhead power line

Moving the 500 kV Egkh “Imereti” N295 mast from the landslide-prone zone

Gvarular suspension

Connection of 500 kV “Mukhrani” to 500 kV “Marneuli-500” overhead line

This site is registered on wpml.org as a development site. Switch to a production site key to remove this banner.