Connection of 500 kV “Mukhrani” to 500 kV “Marneuli-500” overhead line

Gvarular suspension

Moving the 500 kV Egkh “Imereti” N295 mast from the landslide-prone zone

Replacement of damaged wires on the 500 kV EGH “Imeret” overhead power line

Conditions hindering the operation of power transmission lines

Moving the 500 kV Egkh “Imereti” N295 mast from the landslide-prone zone

In connection with the switching of the double-chain 330 kV “1,2 Gardabani” on the Georgia-Azerbaijan border

Replacement of corroded insulators on 500 kV Egkh “Imeret”.