A brief overview of works performed on power transmission lines of JSC “Sakrusenergo” in November 2012
E.G.Kh. “Caucasus”
During the 3-day repair of the EGK in the Georgian section, insulator replacement works were carried out on masts No. 24, 43, 59, 60, 67, 72, 101, 102, 114, in total 145 insulators were replaced. 42-43 and 43-44 wires were straightened and 3-3 rectifiers were installed. The access roads to mast Nos. 58, 59, 69, 79, 86, 90, 95, 97, 112, 113 were restored with the help of a bulldozer.
The masts No. 59, 63, 77, 88, 94, 96, 98, which had been robbed of the angle brackets, were restored, and a total of 580 meters of angle brackets were installed. 695-697, 722-729, 730-733, 734-738, 744-745, 748-749, 750-751, 753-755 (21 Mali – 6.6 km) Access roads to towers #695-697 were cleared. Towers No. 217, No. 234, No. 388, No. 397, No. 496a, No. 711, No. 712, No. 713 were inspected in landslide-prone zones. The short-term point of ice sheet melting was observed.
E.G.Kh. “Imereti”
The following types of works were carried out during the 5-day repair period of the electric power plant: broken insulators #22, 24, 34, 43, 52, 53, 65, 67, 69, 82, 87, 89, 99, 112, 115, 122, 128 were replaced. , 134, 139, 149, 150, 151, 154, 186, 193, 195, 196, 200, 201, 203, 209, 214, 215, 221, 223, 228, 257, 259, 262, 272, 273 275 , 276, 277, 282, 301, 302, 304, 305, 308, 310, 311, 330, 333, 341, 363, 385, 389 on masts, a total of 410 pieces (58 masts). 15 loops were replaced on masts No. 37, 122, 128, on phase C of mast No. 60-61, the overturned wire was straightened and 3 pcs. , the damaged wires of the mast loop #341 were replaced, the damaged protective wire was repaired on the A phase of mast #35-36. In mall No. 22-23, the ground clearance was increased, access roads to mast No. 173 and No. 271 were restored. The masts, which were robbed from the angular №224 and №233, were restored, a total of 80.5 m angular was installed. In the middle of November, the strengthening works of mast #260 by means of gabions were completed.
E.G.Kh. “Kartli-2”
In the section between masts No. 246-290 and 327-375, fruit trees fell and were burned. Missing arc clamps were installed on the intermediate masts holding beams #317, 391, 396, 398. On towers #240, 241, 247, 393, 402, 405, gaps between the foundation and the heel of the tower were filled. Defective spanners were installed on the metal castings of the intermediate masts Nos. 304, 363, 367, 388.
E.G.Kh. “threat”
On the masts No. 163, restored black angulars were painted, inspection was carried out on the section between the masts No. 42-110, the masts were photographed and warning posters were installed. 5 pieces of broken insulators were replaced on mast #258, protective screens were straightened on mast #241, worn out armatures of loops were replaced on masts #243 and #245, broken shunts were replaced on mast #249-250. In the middle of November, the works of hanging the third wire in the section between the towers #42-59 of EKH began, the completion of which is planned for the beginning of December.
E.G.Kh. “Adjara”
Section I of all masts in section #26-50 of EKH were cleaned from iron rust and covered with anti-corrosion paint.