Completed projects Connection of 500 kV “Mukhrani” to 500 kV “Marneuli-500” overhead line Gvarular suspension Moving the 500 kV Egkh “Imereti” N295 mast from the landslide-prone zone Replacement of damaged wires on the 500 kV EGH “Imeret” overhead power line Conditions hindering the operation of power transmission lines Moving the 500 kV Egkh “Imereti” N295 mast from the landslide-prone zone In connection with the switching of the double-chain 330 kV “1,2 Gardabani” on the Georgia-Azerbaijan border Replacement of corroded insulators on 500 kV Egkh “Imeret”.